Building the McMaster Nuclear Reactor

Expandable List

In the mid-1950s, Dr. Harry Thode successfully lobbied the National Research Council of Canada and local industry for funding to build a research reactor at McMaster University. The funds were secured by June of 1956, and in November of that year the contract to build the reactor was awarded to AMF Atomics Ltd (Canada). The design selected was that of a pool type reactor for operational flexibility, with a full containment structure around it for maximum safety.

 Reactor Design and Construction AMF Atomics (Canada) Limited
 Building Design William R. Souter & Associates
 Mechanical and Electrical Design O. G. Moffat Limited
 Structural Design Wagner, McCargar and Filer
 Building Construction Pigott Construction Company Limited
 Mechanical and Electrical Contractors Canadian Comstock Company Limited
 Regulator Canadian Nuclear Safey Commission

The construction of an “MTR Class Reactor” (MTR = Materials Test Reactor) in 1950’s West Hamilton was a unique occurrence, and the progress of the project was documented in a series of photographs. The slide show below begins with the ground breaking in September 1957, through the completion of the containment structure in September 1958, up to the official opening ceremony for the McMaster Nuclear Reactor that was held on April 10, 1959, less than a week after MNR first achieved criticality.

Construction Timeline

Small scale model of mcmaster nuclear reactor, nuclear research building, and john hodgins engineering building.

The building process started with the creation of a scale model showing the Nuclear Research Building and the soon-to-be-built John Hodgins Engineering Building (JHE) and reactor containment building. Design contracts for the containment building and the nuclear reactor were awarded to William R. Souter & Associates and AMF Atomics (Canada) Ltd., respectively.

Small scale model of mcmaster nuclear reactor, nuclear research building, and john hodgins engineering building.

An expansion of the NRB was also in the works both to increase research space and to provide access to the reactor containment building via an above-ground “bridge”.

Ground is prepared for where MNR will be built.

The Pigott Construction Company Limited began construction of the reactor containment building began in the Fall of 1957. This September 26 photograph shows the preparation of the ground where the reactor would eventually stand.

Construction work on extensions to the nuclear research building in 1957.

At the same time, construction began on the extensions to the Nuclear Research Building. Two additional major renovations of the NRB would eventually follow, in 2001 and 2011.

The pentadecahedral shape of MNR is outlined by workers.

By October 10, 1957, the characteristic pentadecahedral (15-sided) shape of the containment building was observable.

Concrete foundation pad of MNR is laid. A section shaped like a figure-8 is visible in the middle - this is where the reactor pool will be built.

Two weeks later, the reinforced concrete foundation pad (33 m diameter x 1.5 m thick) was in place. At the center of the pad, the depression resembling a figure 8 is the bottom of what would become the reactor pool.

Framework of McMaster Nuclear Reactor being built in 1957. Trees and houses are visible in the background.

By November 5th, the framework of the walls of the containment building were taking shape. Toward the centre of the structure, work also continued in the area that was to become the bottom of the reactor pool.

Construction of nuclear research building in 1957.

Progress also continued apace on the additions to the Nuclear Research Building, as shown in this photograph taken on December 4th, 1957.

Construction workers building the McMaster Nuclear Reactor. A crane lifts materials to the top of the structure.

Work continued through the winter months, with the outer forms of the airlock doors and the airlock chamber appearing by February 19th, 1958.

Beam tubes being fitted for McMaster Nuclear Reactor in 1958.

With its end use as an experimental facility in mind, the designs for MNR included six beam ports that could be used for research purposes. The beam tubes were fitted into place, fanning out from where the core of the reactor would eventually be placed, so that each tube could eventually provide a beam of neutrons to one of the six research stations (beam ports) within the containment building. Today, the beam ports are used for applications such as neutron diffraction and neutron radiography.

Construction of the McMaster Nuclear Reactor. A worker stands on the roof.

By March 20, 1958, the structure of the building was beginning to resemble its final appearance. Work began on the roof of the access bridge that would connect the reactor building with the NRB (lower left), while the hatchway that is used to transfer large equipment in or out of the containment building was also taking shape (lower right).

Construction of McMaster Nuclear Reactor. A crane lifts materials to workers at the top of the ractor. Cement trucks are parked in front.

To provide maximum containment, designs for the reactor building specified that the walls be constructed of regular concrete with reinforcing rods. By early Spring (April 9th), the pouring of the concrete walls was under way.

Roof of McMaster Nuclear Reactor under construction. Twelve construction workers stand on and around the roof.

By May 7th, 1958, the roof of the reactor containment building was taking shape. Like the rest of the building, the roof is constructed out of concrete, with a minimum thickness of 30 cm.

MNR's industrial hot cell under construction.

This June 5th photo shows the unfinished area that was to become MNR’s industrial hot cell.

Crane that runs high above the McMaster Nuclear Reactor pool.

Taken inside the reactor building looking up toward the ceiling, this June 5th photo shows the enormous size of the 12 ton crane that runs along a circular track high above the reactor pool. The crane was a necessary design component, allowing heavy and/or lead-shielded items to be lowered in and out of the reactor pool, or down to the lower floors of the containment building.

Exterior of McMaster Nuclear Reactor. Photo taken soon after the building construction was completed in 1958.

This picture of the completed containment building was taken on September 17, 1958 – barely a year after construction began.

McMaster Nuclear Reactor under construction in 1958.

With construction of the containment building complete, work on the nuclear reactor had just begun. Construction continued on the top portion of the pool and the two support bridges that cross it.

Circa 1960. Three researchers operate a hot cell using mechanical arms.

Going down one level inside the containment building, construction of the industrial hot cell was also completed and a pair of mechanical manipulators were installed. The front window of the hot cell is made of leaded glass to protect the user from exposure to the radioactive materials inside the cell.

View from inside a hot cell before it was operational. Through the window, a researcher operating the hot cell's mechanical arms is visible.

This shot was taken from inside the hot cell, prior to introducing any radioactive materials. It provides a great view of what the hot cell user can see, and of the mechanical “arms” that are used for all manipulations.

McMaster Nuclear Reactor beam port floor, circa 1960. Four ports from which neutron beams will later be installed are pictured.

Going down one more floor from the hot cell area, the beam tubes that were fitted into place previously reappear as the five black circles (ports) visible near the floor. The beam port floor is the lowest level within the containment building; the reactor core would later be positioned at the bottom of the concrete pool that lies just the other side of the wall.

A researcher uses equipment inside the McMaster Nuclear Reactor, circa 1960.

By 1960, instrumentation had been brought into the containment building for use in conjunction with the beams of neutrons that are extracted by the beam tubes. Experiments in neutron spectrometry and neutron diffraction were soon underway.

A wideview of the McMaster Nuclear Reactor core and control rods in 1959, before the reactor became operational.

Meanwhile, on the other side of the wall, the control rods were put into place, and photographed from the floor of the reactor pool (on level with the beam port floor).

Two researchers stand next to MNR's control rods on the reactor pool floor, before the pool was filled and the reactor became operational.

Here, the core of the nuclear reactor – where the self-sustaining chain reaction of uranium-235 takes place – is fitted on to the floor of the reactor pool at a depth of 15.2 m below the main (“Experimental”) floor of the building.

Above view of the McMaster Nuclear Reactor pool floor with control rods extending upwards. Two researchers stand next to the control rods. Photographed in 1959.

An alternate view of the reactor core taken from the top of the pool (the Experimental Floor). From this angle, three beam tubes are clearly visible radiating outwards from the reactor core, along with two unoccupied beam ports.

Wide view of the McMaster Nuclear Reactor in 1959. In view is the reactor pool, and the control room and row of office windows.

At pool level (on the Experimental Floor), a support bridge crossing the pool is visible, as well as the overhead crane that was shown earlier. Across the pool on the left lies the Control Room, where reactor operations are monitored. Above the Control Room, a row of offices overlooks the Experimental Floor.

Control room of McMaster Nuclear Reactor in 1959.

The state-of-the-art control room was soon completed and ready for occupancy, with the McMaster Nuclear Reactor first achieving criticality (i.e. a self-sustaining nuclear chain reaction) at 00:36 h on April 4th, 1959.

Reactor operators sit on chairs inside the control room.

Prime Minister Diefenbaker speaks at the opening ceremony of McMaster Nuclear Reactor.

On April 10, 1959, a ceremony was held to officially open the McMaster Nuclear Reactor, the first university-based nuclear reactor in the British Commonwealth. Among the attendees was John Diefenbaker, the Prime Minister of Canada at that time.